Remodel update

So the bathroom remodel is slow and go.  It all takes time to get the shower installed, drywall back up and all taped and mudded.  I feel bad that our "contractor" has made numerous trips over (granted he is only about 6 miles away) just to mud, sand and then mud again such a small area.  It only takes about 10 minutes, but a couple hours out of his life.

Fortunately he is done now and we can paint, then hurry and wait for the other contractor to contact us with the final vanity. Since we haven't picked out the counter top, and we are waiting for them to call us to come take final measurements it will probably be February before I have my bathroom back.

The final work will be well worth the wait.

~~Live Life

To leave a comment, please sign in with
or or

Comments (0)